LTV: loan amount divided by property value
LTV = loan amount ÷ property value × 100.
The value basis matters. An as-is value describes the property in its current condition; an as-completed value assumes specified work has been finished. A ratio calculated against completed value cannot be read as a ratio against today's value.
Ask which value the financing proposal uses and how it was established. Program rules can differ: for example, Fannie Mae's first-mortgage guidance distinguishes purchase and refinance calculations. That program's rules do not establish the terms of a private property loan.
Also confirm the loan amount being measured. A total commitment, an initial advance and a balance already drawn are different numbers. If other debt remains secured by the property, ask how it enters the calculation.
LTC: loan amount divided by the cost basis
LTC = loan amount ÷ eligible project costs × 100.
The OCC's commercial real estate handbook defines LTC using the loan relative to property and construction costs. For a particular financing proposal, confirm the eligible cost basis with the provider. Your full project budget and the costs recognized for financing may differ.
Ask specifically about purchase costs, renovation, permits, contingency, interest, fees and holding expenses. Including an expense in your worksheet does not establish that it is eligible for financing. Keep the complete budget visible even when some items fall outside the financing calculation.
ARV: an estimate, rather than a percentage
After-repair value, or ARV, is an estimate of the property's value after the planned work. It is a dollar amount, not a lending ratio or a guaranteed selling price.
Label where your estimate comes from and which improvements it assumes. A planning estimate is not automatically an appraisal or a value accepted by a lender. An appraisal can estimate completed value before work finishes: Fannie Mae's HomeStyle guidance illustrates this by requiring a value opinion based on the planned renovation. That is a program-specific example, not a statement that every financing provider follows the same process.
One project, two ratios
Consider this hypothetical budget. The figures are for explanation and are not Integra loan terms.
| Item | Assumption |
|---|---|
| Purchase | $250,000 |
| Renovation | $75,000 |
| Other budgeted project costs | $25,000 |
| Total project costs | $350,000 |
| Estimated completed value | $450,000 |
| Proposed total loan | $280,000 |
Assume, solely for this example, that all $350,000 of costs count toward the LTC basis and the loan is measured at its full proposed amount.
LTC: $280,000 ÷ $350,000 × 100 = 80%.
Loan relative to estimated completed value: $280,000 ÷ $450,000 × 100 = 62.2%, rounded to one decimal place.
Both describe the same loan. Neither calculation tells you whether financing will be approved, what the pricing will be or how much is advanced at closing.
The budget exceeds the proposed loan by $70,000. That is an arithmetic funding gap. It is not automatically your cash-to-close figure. Existing contributions, eligible costs, reserves and the timing of advances or reimbursements affect how much cash must be available and when. Ask for a schedule separating closing funds from money needed during the work.
Test the assumptions before relying on them
Keep the hypothetical loan fixed at $280,000 and change one input at a time:
- If estimated completed value falls to $400,000, the loan-to-completed-value ratio rises to 70%. The original cost budget has not changed.
- If project costs rise to $375,000, LTC falls to 74.7%, while the arithmetic funding gap grows to $95,000. A lower LTC in this situation does not mean the project needs less cash.
These scenarios show why a percentage alone can hide the decision that matters. Value risk and cost risk affect different parts of the plan. Neither scenario assumes that the proposed loan increases to cover a shortfall.
Keep the resale difference separate from profit
Subtracting the example's $350,000 budget from its $450,000 estimated resale value leaves a $100,000 projected difference. It is not verified net profit. Financing charges, selling expenses, taxes or other costs may be missing or estimated, and the sale price remains uncertain. Avoid double-counting expenses already included in the budget.
The project-budget worksheet helps organize costs and resale assumptions. It does not calculate loan approval, required cash or net profit. Start there, then prepare a project inquiry with your budget, value basis, proposed financing and repayment plan. Review the prepared email and send it from your email app.